Did you know 72% of builders faced project delays last quarter due to the LVL timber shortage? With lumber prices swinging 30% monthly, how can you secure reliable structural materials? Your competitors aren’t waiting—and neither should you.
(lvl timber shortage)
When LVL timber for sale disappears from local suppliers, engineered solutions become your secret weapon. Our 1.75E-5500 PSI LVL beams carry 20% more load than standard timber. Check the proof:
Spec | Standard Timber | Our LVL |
---|---|---|
Moisture Resistance | 8% swelling | 0.5% swelling |
Max Span (20ft) | Requires 3 beams | Single beam solution |
Lead Time | 12-16 weeks | 3-5 weeks |
While others ration inventory, we’ve stockpiled 15 million board-feet of LVL timber framing materials. Compare delivery guarantees:
• Competitor A: 60-day partial shipments
• Competitor B: 35% price premiums
• Our Guarantee: Fully customized orders in 21 days or 5% discount
Need 28ft clear spans for that cathedral ceiling? Our parametric design tool lets you:
1. Input exact load requirements
2. Select moisture ratings
3. Choose fire-retardant coatings
4. Get instant pricing
“We cut framing costs 18% using their LVL configurator.” – Jason R., project manager
When a Phoenix hospital expansion hit roadblocks, our just-in-time delivery of 850 LVL beams saved $220k in delay penalties. See how we:
• Pre-fabricated wall sections offsite
• Used RFID tracking for real-time logistics
• Completed framing 11 days ahead of schedule
Every day you wait, competitors lock down remaining LVL stock. Our inventory dashboard shows 1,283 LVL timber framing kits available today. Click below to:
→ Reserve guaranteed stock
→ Schedule free engineering consult
→ Download load span charts
(lvl timber shortage)
A: The LVL timber shortage stems from increased construction demand, supply chain disruptions, and limited raw material availability. These factors have collectively strained production and distribution timelines.
A: Check with specialized lumber suppliers, online construction material marketplaces, or local builders’ cooperatives. Some retailers may offer pre-order options to secure stock.
A: Yes, alternatives like glulam beams or steel framing may be used, but consult an engineer first. LVL’s strength-to-weight ratio makes substitutions project-specific.
A: Prices have risen due to scarcity and higher logistics costs. Contractors are advised to lock in quotes early and factor in potential delays.
A: Areas with local LVL manufacturing facilities or established timber networks may have better availability. Regional suppliers often prioritize nearby markets during shortages.
A: LVL offers superior dimensional stability, consistent strength, and reduced waste. It’s ideal for long spans and complex designs compared to solid wood.
A: Explore alternative materials or adjust timelines based on supplier lead times. Proactive planning and flexible designs can mitigate delays caused by shortages.